[1]
Acebes, F. et al. 2014. A new approach for project control under uncertainty. Going back to the basics. International Journal of Project Management. 32, 3 (Apr. 2014), 423–434. DOI:https://doi.org/10.1016/j.ijproman.2013.08.003.
[2]
Ackermann, F. et al. 2007. Systemic risk assessment: a case study. Journal of the Operational Research Society. 58, 1 (Jan. 2007), 39–51. DOI:https://doi.org/10.1057/palgrave.jors.2602105.
[3]
Adelakun, O. et al. 5AD. Hybrid Project Management: Agile with Discipline. International Conference on Information Resources Management (CONF-IRM) (Jan. 5AD).
[4]
Ahola, T. et al. 2014. What is project governance and what are its origins? International Journal of Project Management. 32, 8 (Nov. 2014), 1321–1332. DOI:https://doi.org/10.1016/j.ijproman.2013.09.005.
[5]
Akintoye, A. 1994. Design and build: a survey of construction contractors’ views. Construction Management and Economics. 12, 2 (Mar. 1994), 155–163. DOI:https://doi.org/10.1080/01446199400000021.
[6]
Akintoye, A.S. and MacLeod, M.J. 1997. Risk analysis and management in construction. International Journal of Project Management. 15, 1 (Feb. 1997), 31–38. DOI:https://doi.org/10.1016/S0263-7863(96)00035-X.
[7]
Alter, R. 2018. Brexit and the moon landing from a project complexity perspective: A comparative case study. Case Studies in Business and Management. 5, 2 (Oct. 2018). DOI:https://doi.org/10.5296/csbm.v5i2.13484.
[8]
Andreas Opelt, , Boris Gloger, , Wolfgang Pfarl, , and Ralf Mittermayr 2013. Agile Contracts : Creating and Managing Successful Projects with Scrum. John Wiley & Sons, Incorporated.
[9]
Andrew Haylen 27AD. High Speed 2: the business case, costs and spending. House of Commons Library.
[10]
Anumba, C.J. and Evbuomwan, N.F.O. 1997. Concurrent engineering in design-build projects. Construction Management and Economics. 15, 3 (May 1997), 271–281. DOI:https://doi.org/10.1080/014461997373006.
[11]
APM /INCOSEUK Systems Thinking SIG 16AD. Systems Thinking for Portfolio, Programme and Project Managers.
[12]
Aramo-Immonen, H. and Vanharanta, H. 2009. Project management: The task of holistic systems thinking. Human Factors and Ergonomics in Manufacturing. 19, 6 (Nov. 2009), 582–600. DOI:https://doi.org/10.1002/hfm.20185.
[13]
Arditi, D. et al. 2017. Effect of organizational culture on delay in construction. International Journal of Project Management. 35, 2 (Feb. 2017), 136–147. DOI:https://doi.org/10.1016/j.ijproman.2016.10.018.
[14]
Association for Project Management 2019. APM body of knowledge. Association for Project Management.
[15]
Atkinson, R. et al. 2006. Fundamental uncertainties in projects and the scope of project management. International Journal of Project Management. 24, 8 (Nov. 2006), 687–698. DOI:https://doi.org/10.1016/j.ijproman.2006.09.011.
[16]
Atkinson, R. et al. 2006. Fundamental uncertainties in projects and the scope of project management. International Journal of Project Management. 24, 8 (Nov. 2006), 687–698. DOI:https://doi.org/10.1016/j.ijproman.2006.09.011.
[17]
Atkinson, R. et al. 2006. Fundamental uncertainties in projects and the scope of project management. International Journal of Project Management. 24, 8 (Nov. 2006), 687–698. DOI:https://doi.org/10.1016/j.ijproman.2006.09.011.
[18]
Atkinson, R. 1999. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management. 17, 6 (Dec. 1999), 337–342. DOI:https://doi.org/10.1016/S0263-7863(98)00069-6.
[19]
Atkinson, R. 1999. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management. 17, 6 (Dec. 1999), 337–342. DOI:https://doi.org/10.1016/S0263-7863(98)00069-6.
[20]
Aubry, M. and Lavoie-Tremblay, M. 2018. Rethinking organizational design for managing multiple projects. International Journal of Project Management. 36, 1 (Jan. 2018), 12–26. DOI:https://doi.org/10.1016/j.ijproman.2017.05.012.
[21]
Augustine, S. et al. 2005. Agile project management. Communications of the ACM. 48, 12 (Dec. 2005), 85–89. DOI:https://doi.org/10.1145/1101779.1101781.
[22]
Bakker, R.M. 2010. Taking Stock of Temporary Organizational Forms: A Systematic Review and Research Agenda. International Journal of Management Reviews. 12, 4 (Dec. 2010), 466–486. DOI:https://doi.org/10.1111/j.1468-2370.2010.00281.x.
[23]
Belbin Team Roles: https://www.belbin.com/about/belbin-team-roles/.
[24]
Benítez-Ávila, C. et al. 2018. Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners’ contribution. International Journal of Project Management. 36, 3 (Apr. 2018), 429–443. DOI:https://doi.org/10.1016/j.ijproman.2017.12.005.
[25]
Bing, L. et al. 2005. The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management. 23, 1 (Jan. 2005), 25–35. DOI:https://doi.org/10.1016/j.ijproman.2004.04.006.
[26]
Bjorvatn, T. and Wald, A. 2018. Project complexity and team-level absorptive capacity as drivers of project management performance. International Journal of Project Management. 36, 6 (Aug. 2018), 876–888. DOI:https://doi.org/10.1016/j.ijproman.2018.05.003.
[27]
Boris Johnson to repay the north by approving HS2 | News | The Times: https://www.thetimes.co.uk/article/boris-johnson-to-repay-north-by-approving-hs2-vwbgfjpdj.
[28]
Bresnen, M. and Marshall, N. 2000. Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics. 18, 2 (Mar. 2000), 229–237. DOI:https://doi.org/10.1080/014461900370852.
[29]
Bresnen, M.J. and Haslam, C.O. 1991. Construction industry clients: A survey of their attributes and project management practices. Construction Management and Economics. 9, 4 (Jul. 1991), 327–342. DOI:https://doi.org/10.1080/01446199100000026.
[30]
Brunet, M. 2019. Governance-as-practice for major public infrastructure projects: A case of multilevel project governing. International Journal of Project Management. 37, 2 (Feb. 2019), 283–297. DOI:https://doi.org/10.1016/j.ijproman.2018.02.007.
[31]
Bryde, D. et al. 2018. Conditions of success for earned value analysis in projects. International Journal of Project Management. 36, 3 (Apr. 2018), 474–484. DOI:https://doi.org/10.1016/j.ijproman.2017.12.002.
[32]
Bryson, J.M. 2004. What to do when Stakeholders matter. Public Management Review. 6, 1 (Mar. 2004), 21–53. DOI:https://doi.org/10.1080/14719030410001675722.
[33]
Carlile, P.R. 2002. A Pragmatic View of Knowledge and Boundaries: Boundary Objects in New Product Development. Organization Science. 13, 4 (Aug. 2002), 442–455. DOI:https://doi.org/10.1287/orsc.13.4.442.2953.
[34]
Carton, A.M. and Cummings, J.M. 2012. A Theory of Subgroups in Work Teams. Academy of Management Review. 37, 3 (2012).
[35]
Chapman, C. 2006. Key points of contention in framing assumptions for risk and uncertainty management. International Journal of Project Management. 24, 4 (May 2006), 303–313. DOI:https://doi.org/10.1016/j.ijproman.2006.01.006.
[36]
Chapman, C. 1997. Project risk analysis and management—PRAM the generic process. International Journal of Project Management. 15, 5 (Oct. 1997), 273–281. DOI:https://doi.org/10.1016/S0263-7863(96)00079-8.
[37]
Chen, Edward T.1 edwardchen@uml.edu 2015. EMERGING TRENDS IN PROJECT MANAGEMENT: EXPEDITING BUSINESS. (2015), 1–13.
[38]
Cherns, A.B. and Bryant, D.T. 1984. Studying the client’s role in construction management. Construction Management and Economics. 2, 2 (Sep. 1984), 177–184. DOI:https://doi.org/10.1080/01446198400000016.
[39]
Chizhik, A.W. et al. 2009. Intragroup Conflict and Cooperation: An Introduction. Journal of Social Issues. 65, 2 (Jun. 2009), 251–259. DOI:https://doi.org/10.1111/j.1540-4560.2009.01599.x.
[40]
Christian Wolmar 2020. HS2 is a calamity, but it would be politically toxic for Boris Johnson to scrap it | Christian Wolmar. Guardian. (Jan. 2020).
[41]
Cicmil, S. et al. 2006. Rethinking Project Management: Researching the actuality of projects. International Journal of Project Management. 24, 8 (Nov. 2006), 675–686. DOI:https://doi.org/10.1016/j.ijproman.2006.08.006.
[42]
Cicmil, S. et al. 2006. Rethinking Project Management: Researching the actuality of projects. International Journal of Project Management. 24, 8 (Nov. 2006), 675–686. DOI:https://doi.org/10.1016/j.ijproman.2006.08.006.
[43]
Cicmil, S. and Hodgson, D. 2006. New Possibilities for Project Management Theory: A Critical Engagement. Project Management Journal. 37, 3 (Aug. 2006), 111–122. DOI:https://doi.org/10.1177/875697280603700311.
[44]
Cobb, C.G. Making sense of agile project management: balancing control and agility. Wiley.
[45]
Conditions for Project Success: https://www.apm.org.uk/resources/find-a-resource/conditions-for-project-success/.
[46]
Crawford, L. et al. 2006. Aligning Capability with Strategy: Categorizing Projects to do the Right Projects and to do Them Right. Project Management Journal. 37, 2 (Jun. 2006), 38–50. DOI:https://doi.org/10.1177/875697280603700205.
[47]
Cresswell, K. and Sheikh, A. 2009. The NHS Care Record Service (NHS CRS): recommendations from the literature on successful implementation and adoption. Journal of Innovation in Health Informatics. 17, 3 (Sep. 2009), 153–160. DOI:https://doi.org/10.14236/jhi.v17i3.730.
[48]
Cui, C. et al. 2018. Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management. 36, 5 (Jul. 2018), 773–794. DOI:https://doi.org/10.1016/j.ijproman.2018.03.004.
[49]
Cui, C. et al. 2018. Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management. 36, 5 (Jul. 2018), 773–794. DOI:https://doi.org/10.1016/j.ijproman.2018.03.004.
[50]
Daniel, E. and Daniel, P.A. 2019. Megaprojects as complex adaptive systems: The Hinkley point C case. International Journal of Project Management. (Jun. 2019). DOI:https://doi.org/10.1016/j.ijproman.2019.05.001.
[51]
Daniel, P.A. and Daniel, C. 2018. Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management. International Journal of Project Management. 36, 1 (Jan. 2018), 184–197. DOI:https://doi.org/10.1016/j.ijproman.2017.07.004.
[52]
Daniel, P.A. and Daniel, C. 2018. Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management. International Journal of Project Management. 36, 1 (Jan. 2018), 184–197. DOI:https://doi.org/10.1016/j.ijproman.2017.07.004.
[53]
Daniel, P.A. and Daniel, C. 2018. Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management. International Journal of Project Management. 36, 1 (Jan. 2018), 184–197. DOI:https://doi.org/10.1016/j.ijproman.2017.07.004.
[54]
David Hillson What is risk? Towards a common definition.
[55]
David Hillson When is a Risk not a Risk. IPMA.
[56]
Davies, A. et al. 2016. Dynamic Capabilities in Complex Projects: The Case of London Heathrow Terminal 5. Project Management Journal. 47, 2 (Apr. 2016), 26–46. DOI:https://doi.org/10.1002/pmj.21574.
[57]
Dibble, R. and Gibson, C.B. 2018. Crossing team boundaries: A theoretical model of team boundary permeability and a discussion of why it matters. Human Relations. 71, 7 (Jul. 2018), 925–950. DOI:https://doi.org/10.1177/0018726717735372.
[58]
Dougherty, D. 1992. Interpretive Barriers to Successful Product Innovation in Large Firms. Organization Science. 3, 2 (May 1992), 179–202. DOI:https://doi.org/10.1287/orsc.3.2.179.
[59]
Drach-Zahavy, A. and Somech, A. 2010. From an Intrateam to an Interteam Perspective of Effectiveness: The Role of Interdependence and Boundary Activities. Small Group Research. 41, 2 (Apr. 2010), 143–174. DOI:https://doi.org/10.1177/1046496409356479.
[60]
Duffield, S.M. and Whitty, S.J. 2016. Application of the Systemic Lessons Learned Knowledge model for Organisational Learning through Projects. International Journal of Project Management. 34, 7 (Oct. 2016), 1280–1293. DOI:https://doi.org/10.1016/j.ijproman.2016.07.001.
[61]
Eden, C. et al. 2000. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects. Journal of the Operational Research Society. 51, 3 (Mar. 2000), 291–300. DOI:https://doi.org/10.1057/palgrave.jors.2600919.
[62]
Elder-Vass, D. 2010. The causal power of social structures: emergence, structure and agency. Cambridge University Press.
[63]
ELIEZER, OREN1 orenel@post.jce.ac.ilDROR, SHUKI2 dror@braude.ac.il 2018. QFD Methodology for LINKING PROJECT SUCCESS FACTORS: to Outcomes in a Specific Business Case. QFD Methodology for LINKING PROJECT SUCCESS FACTORS: to Outcomes in a Specific Business Case. (2018), 40–49. DOI:https://doi.org/10.19255/JMPM01504.
[64]
Farooq, M.U. et al. 2018. Improving the risk quantification under behavioural tendencies: A tale of construction projects. International Journal of Project Management. 36, 3 (Apr. 2018), 414–428. DOI:https://doi.org/10.1016/j.ijproman.2017.12.004.
[65]
Feylizadeh, M.R. et al. 2018. Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study. Journal of Intelligent & Fuzzy Systems. 35, 3 (Oct. 2018), 3615–3631. DOI:https://doi.org/10.3233/JIFS-18171.
[66]
Fink, L. and Pinchovski, B. 2020. It is about time: Bias and its mitigation in time-saving decisions in software development projects. International Journal of Project Management. 38, 2 (Feb. 2020), 99–111. DOI:https://doi.org/10.1016/j.ijproman.2020.01.001.
[67]
Floricel, S. et al. 2016. Complexity, uncertainty-reduction strategies, and project performance. International Journal of Project Management. 34, 7 (Oct. 2016), 1360–1383. DOI:https://doi.org/10.1016/j.ijproman.2015.11.007.
[68]
Flyvbjerg, B. et al. 2003. Megaprojects and risk: an anatomy of ambition. Cambridge University Press.
[69]
Flyvbjerg, B. et al. 2003. Megaprojects and risk: an anatomy of ambition. Cambridge University Press.
[70]
Flyvbjerg, B. et al. 2003. Megaprojects and risk: an anatomy of ambition. Cambridge University Press.
[71]
Flyvbjerg, Bent Design by Deception: The Politics of Megaproject Approval.
[72]
Friedman, A.L. and Miles, S. 2002. Developing Stakeholder Theory. Journal of Management Studies. 39, 1 (Jan. 2002), 1–21. DOI:https://doi.org/10.1111/1467-6486.00280.
[73]
Friedman, A.L. and Miles, S. 2006. Stakeholders: theory and practice. Oxford University Press.
[74]
Garel, G. 2013. A history of project management models: From pre-models to the standard models. International Journal of Project Management. 31, 5 (Jul. 2013), 663–669. DOI:https://doi.org/10.1016/j.ijproman.2012.12.011.
[75]
George Ellis 2015. Project Management in Product Development : Leadership Skills and Management Techniques to Deliver Great Products. Elsevier Science & Technology.
[76]
Gharaibeh, Hani1 2011. Improving Project Team Learning in Major Projects -- A Case Study Comparison. Improving Project Team Learning in Major Projects -- A Case Study Comparison. 9, Issue 2 (2011), 1–13.
[77]
Government underestimated HS2 "complexity and risk”, says National Audit Office: https://www.newstatesman.com/spotlight/transport/2020/01/government-underestimated-hs2-complexity-and-risk-says-national-audit.
[78]
Grisham, T.W. 2010. International project management: leadership in complex environments. Wiley.
[79]
Gunsteren, L.A. van et al. 2011. Stakeholder-oriented project management: tools and concepts. IOS Press.
[80]
Guo, F. et al. 2014. Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis. International Journal of Project Management. 32, 5 (Jul. 2014), 815–826. DOI:https://doi.org/10.1016/j.ijproman.2013.10.001.
[81]
Gupta, S.K. et al. 2019. Systematic literature review of project failures: Current trends and scope for future research. Computers & Industrial Engineering. 127, (Jan. 2019), 274–285. DOI:https://doi.org/10.1016/j.cie.2018.12.002.
[82]
Gwyn Topham 2020. Can the troubled HS2 project get back on track? Guardian. (Jan. 2020).
[83]
Gwyn Topham 2020. HS2 costs could rise to £106bn or more, warns government review. Guardian. (Jan. 2020).
[84]
Hall, M. 2009. DBFO and the supply chain. University of Bristol.
[85]
Hall, M. et al. 2000. Private finance, public roads: configuring the supply chain in PFI highway construction. European Journal of Purchasing & Supply Management. 6, 3–4 (Dec. 2000), 227–235. DOI:https://doi.org/10.1016/S0969-7012(00)00018-6.
[86]
Heaton, K.M. et al. 2016. Learning Lessons from Software Implementation Projects: An Exploratory Study. Knowledge and Process Management. 23, 4 (Oct. 2016), 293–306. DOI:https://doi.org/10.1002/kpm.1525.
[87]
HENRIKSEN, ANDRE1 andre.henriksen@uit.noPEDERSEN, SVEN ARNE R.2 sven.arne.r.pedersen@uit.no 2017. A qualitative case study on AGILE PRACTICES AND PROJECT SUCCESS in agile software projects. A qualitative case study on AGILE PRACTICES AND PROJECT SUCCESS in agile software projects. (2017), 62–73. DOI:https://doi.org/10.19255/JMPM01306.
[88]
High Speed 2 - Wikipedia: https://en.wikipedia.org/wiki/High_Speed_2.
[89]
High Speed 2 home page: https://www.hs2.org.uk/.
[90]
High Speed Two: A progress update - National Audit Office (NAO) Press release: https://www.nao.org.uk/press-release/high-speed-two-a-progress-update/.
[91]
High Speed Two: A progress update - National Audit Office (NAO) Report: https://www.nao.org.uk/report/high-speed-two-a-progress-update/.
[92]
High Speed Two: A progress update - National Audit Office (NAO) Report: https://www.nao.org.uk/report/high-speed-two-a-progress-update/.
[93]
High Speed Two (HS2) Limited - GOV.UK: https://www.gov.uk/government/organisations/high-speed-two-limited.
[94]
Highsmith, J.A. Agile project management: creating innovative products. Addison-Wesley.
[95]
Hodgson, D. and Cicmil, S. 2008. The other side of projects: the case for critical project studies. International Journal of Managing Projects in Business. 1, 1 (Jan. 2008), 142–152. DOI:https://doi.org/10.1108/17538370810846487.
[96]
Hodgson, D.E. and Cicmil, S. 2006. Making projects critical. Palgrave Macmillan.
[97]
House of Commons - The National Programme for IT in the NHS: an update on the delivery of detailed care records systems - Public Accounts Committee: https://publications.parliament.uk/pa/cm201012/cmselect/cmpubacc/1070/107002.htm.
[98]
HS2 | Curzon Street landowners could claim millions after court ruling - New Civil Engineer: https://www.newcivilengineer.com/latest/hs2-curzon-street-landowners-could-claim-millions-after-court-ruling-18-02-2020/.
[99]
HS2 - What is it and how can my business benefit? | GBCC: https://www.greaterbirminghamchambers.com/research-campaigning/hot-topics/hs2.
[100]
HS2 and the Chinese: What now? | Comment | Building: https://www.building.co.uk/hs2-and-the-chinese-what-now/5104354.article.
[101]
HS2 benefits hugely underestimated - BBC News: https://www.bbc.co.uk/news/topics/cgdwvpvk35zt/hs2.
[102]
HS2 costs out of control, says review’s deputy chair - BBC News: https://www.bbc.co.uk/news/business-50995116.
[103]
HS2 direct lines ‘could bring £1.4bn of benefits’ - The Transport Network: 9AD. https://www.transport-network.co.uk/HS2-direct-lines-could-bring-14bn-of-benefits/16147.
[104]
HS2: Give me the facts, says Shapps - BBC News: https://www.bbc.co.uk/news/business-51171249.
[105]
HS2: Government to give high-speed rail line the go-ahead - BBC News: https://www.bbc.co.uk/news/business-51443421.
[106]
HS2 in balance as government reviews rail scheme’s costs and benefits | News | Architects Journal: https://www.architectsjournal.co.uk/news/hs2-in-balance-as-government-reviews-rail-schemes-costs-and-benefits/10044140.article.
[107]
HS2 Ltd denies watering down environmental pledges - The Transport Network: https://www.transport-network.co.uk/HS2-Ltd-denies-watering-down-environmental-pledges/16361.
[108]
HS2 ‘perfect example’ of broken funding system, claims finance chief - New Civil Engineer: https://www.newcivilengineer.com/latest/hs2-perfect-example-of-broken-funding-system-claims-finance-chief-25-02-2020/.
[109]
HS2 phase 2 civils design costs rise 50% | Construction Enquirer: https://www.constructionenquirer.com/2019/12/20/hs2-phase-2-civils-design-cost-rises-50/.
[110]
HS2 review criticised by deputy chair of panel - BBC News: https://www.bbc.co.uk/news/business-50280270.
[111]
HS2 revises environmental policy document: https://www.endsreport.com/article/1668736/hs2-revises-environmental-policy-document.
[112]
HS2 risks misjudged from the start, says watchdog - BBC News: https://www.bbc.co.uk/news/business-51223101.
[113]
HS2 route: How much will the rail scheme cost? - BBC News: https://www.bbc.co.uk/news/uk-16473296.
[114]
HS2: Scrapping troubled rail link could cost £12bn, say reports | The Independent: https://www.independent.co.uk/news/uk/home-news/hs2-cost-scrap-railway-london-birmingham-manchester-leeds-a9302126.html.
[115]
HS2 should happen despite rising cost, says review - BBC News: https://www.bbc.co.uk/news/business-50388738.
[116]
HS2: Six reasons why the rail route is so expensive - BBC News: https://www.bbc.co.uk/news/business-51415590.
[117]
HS2: UK in talks with China over construction of high-speed line - BBC News: https://www.bbc.co.uk/news/business-51512831.
[118]
HS2’s ballooning budget was ‘covered up’ - BBC News: https://www.bbc.co.uk/news/business-49482701.
[119]
Ijs̃, L. and Tuominen, K. 2005. Quality in project management: ISO 10006 : self-assessment work book. Benchmarking Ltd.
[120]
Jaafari, A. 2001. Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. International Journal of Project Management. 19, 2 (Feb. 2001), 89–101. DOI:https://doi.org/10.1016/S0263-7863(99)00047-2.
[121]
Jackson, M.C. 2019. Critical systems thinking and the management of complexity: responsible leadership for a complex world. John Wiley & Sons, Inc.
[122]
Jackson, M.C. 2019. Critical systems thinking and the management of complexity: responsible leadership for a complex world. John Wiley & Sons, Inc.
[123]
Jackson, M.C. Systems thinking: creative holism for managers. John Wiley & Sons.
[124]
Jamie Lynn Cooke 2012. Everything You Want to Know about Agile : How to Get Agile Results in a Less-Than-agile Organization. IT Governance Ltd.
[125]
Jehn, K.A. 1995. A Multimethod Examination of the Benefits and Detriments of Intragroup Conflict. Administrative Science Quarterly. 40, 2 (Jun. 1995). DOI:https://doi.org/10.2307/2393638.
[126]
Jehn, K.A. 1997. A Qualitative Analysis of Conflict Types and Dimensions in Organizational Groups. Administrative Science Quarterly. 42, 3 (Sep. 1997). DOI:https://doi.org/10.2307/2393737.
[127]
Jennings, W. 2012. Executive Politics, Risk and the Mega-Project Paradox. Executive politics in times of crisis. Palgrave Macmillan. 239–263.
[128]
Jennings, W. 2012. Executive Politics, Risk and the Mega-Project Paradox. Executive politics in times of crisis. Palgrave Macmillan. 239–263.
[129]
Jepsen, A.L. and Eskerod, P. 2009. Stakeholder analysis in projects: Challenges in using current guidelines in the real world. International Journal of Project Management. 27, 4 (May 2009), 335–343. DOI:https://doi.org/10.1016/j.ijproman.2008.04.002.
[130]
Jing Yang Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management. 15, 4, 337–348.
[131]
John Carvel 2006. NHS risks £20bn white elephant, say auditors. Guardian. (Jun. 2006).
[132]
John Goodpasture 2010. Project Management the Agile Way : Making it Work in the Enterprise. J. Ross Publishing.
[133]
John Stone 31AD. HS2 is the only option for Britain’s railways | The Independent. (31AD).
[134]
Jones, stephen Agile and Earned Value. Association for Project Management.
[135]
Karlsen, J.T. 2002. Project Stakeholder Management. Engineering Management Journal. 14, 4 (Dec. 2002), 19–24. DOI:https://doi.org/10.1080/10429247.2002.11415180.
[136]
Kate Proctor 2020. HS2 to be given go-ahead by government despite fierce opposition. Guardian. (Feb. 2020).
[137]
Keinz, P. et al. 2021. Special issue: Managing open and user innovation by projects: Sensing, seizing and transforming. International Journal of Project Management. (Feb. 2021). DOI:https://doi.org/10.1016/j.ijproman.2021.02.001.
[138]
Kerzner, H. 2013. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons, Inc.
[139]
Kerzner, H. 2013. Project management: case studies. John Wiley & Sons, Inc.
[140]
Kerzner, H. 2019. Using the project management maturity model: strategic planning for project management. John Wiley & Sons, Inc.
[141]
Kim H. Pries , and Jon M. Quigley 2010. Scrum Project Management. Taylor & Francis Group.
[142]
Kim Heldman , and Kim Heldman 2005. Project Manager’s Spotlight on Risk Management. John Wiley & Sons, Incorporated.
[143]
Kim, J. 1999. Making sense of emergence. Philosophical Studies. 95, 1/2 (1999), 3–36. DOI:https://doi.org/10.1023/A:1004563122154.
[144]
Koskela, L. et al. Epistemological Explanation of Lean Construction. Journal of Construction Engineering and Management. 145, 2.
[145]
Krusi, Markus1Whitty, Stephen Jonathan1 2019. The Practitioner’s Tapestry: Revealing the epistemological diversity to project management knowledge. The Practitioner’s Tapestry: Revealing the epistemological diversity to project management knowledge. 7, Issue 3 (2019), 196–226. DOI:https://doi.org/10.19255/JMPM02010.
[146]
Kutsch, E. and Hall, M. 2010. Deliberate ignorance in project risk management. International Journal of Project Management. 28, 3 (Apr. 2010), 245–255. DOI:https://doi.org/10.1016/j.ijproman.2009.05.003.
[147]
Kutsch, E. and Hall, M. 2005. Intervening conditions on the management of project risk: Dealing with uncertainty in information technology projects. International Journal of Project Management. 23, 8 (Nov. 2005), 591–599. DOI:https://doi.org/10.1016/j.ijproman.2005.06.009.
[148]
LAM, E.W.M. et al. 2003. Potential Problems of Running Design-build Projects in Construction. HKIE Transactions. 10, 3 (Jan. 2003), 8–14. DOI:https://doi.org/10.1080/1023697X.2003.10667915.
[149]
Leach, L.P. 2014. Critical chain project management. Artech House.
[150]
Lehtinen, J. and Aaltonen, K. 2020. Organizing external stakeholder engagement in inter-organizational projects: Opening the black box. International Journal of Project Management. 38, 2 (Feb. 2020), 85–98. DOI:https://doi.org/10.1016/j.ijproman.2019.12.001.
[151]
Lientz, B.P. 2013. Project management: a problem-based approach. Palgrave Macmillan.
[152]
Lima, P.F. de A. and Verbano, C. 2019. Project Risk Management Implementation in SMEs: A Case Study from Italy. Journal of technology management & innovation. 14, 1 (2019), 3–10. DOI:https://doi.org/10.4067/S0718-27242019000100003.
[153]
Ling, F.Y.Y. and Kerh, S.H. 2004. Comparing the Performance of Design-Build and Design-Bid-Build Building Projects in Singapore. Architectural Science Review. 47, 2 (Jun. 2004), 163–175. DOI:https://doi.org/10.1080/00038628.2004.9697040.
[154]
Liu, J.Y.-C. et al. 2011. Relationships among interpersonal conflict, requirements uncertainty, and software project performance. International Journal of Project Management. 29, 5 (Jul. 2011), 547–556. DOI:https://doi.org/10.1016/j.ijproman.2010.04.007.
[155]
Lloyd Fletcher and Sturdy, A. The Subjectivity of Boundary Spanning – Composite Boundaries in Project Working.
[156]
Lock, D. 2013. Naked Project Management: the Bare Facts. Ashgate Publishing Ltd.
[157]
Loosemore, M. and McCarthy, C.S. 2008. Perceptions of Contractual Risk Allocation in Construction Supply Chains. Journal of Professional Issues in Engineering Education and Practice. 134, 1 (Jan. 2008), 95–105. DOI:https://doi.org/10.1061/(ASCE)1052-3928(2008)134:1(95).
[158]
Lords: HS2 needs new costs and benefits assessment | International Railway Journal: 16AD. https://www.railjournal.com/passenger/high-speed/lords-hs2-costs-benefits-assessment/.
[159]
Louise Butcher High Speed 2 (HS2) Phase 2a. House of Commons.
[160]
LOVE, P.E.D. et al. 1999. Determining the causal structure of rework influences in construction. Construction Management and Economics. 17, 4 (Jul. 1999), 505–517. DOI:https://doi.org/10.1080/014461999371420.
[161]
Love, P.E.D. et al. 2000. Modelling the dynamics of design error induced rework in construction. Construction Management and Economics. 18, 5 (Jul. 2000), 567–574. DOI:https://doi.org/10.1080/014461900407374.
[162]
Love, P.E.D. et al. 2018. Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction. Production Planning & Control. 29, 5 (Apr. 2018), 353–366. DOI:https://doi.org/10.1080/09537287.2018.1424961.
[163]
Love, P.E.D. and Edwards, D.J. 2004. Forensic project management: The underlying causes of rework in construction projects. Civil Engineering and Environmental Systems. 21, 3 (Sep. 2004), 207–228. DOI:https://doi.org/10.1080/10286600412331295955.
[164]
Love, P.E.D. and Li, H. 2000. Quantifying the causes and costs of rework in construction. Construction Management and Economics. 18, 4 (Jun. 2000), 479–490. DOI:https://doi.org/10.1080/01446190050024897.
[165]
Marras, A. 2006. Emergence and reduction: Reply to Kim. Synthese. 151, 3 (Aug. 2006), 561–569. DOI:https://doi.org/10.1007/s11229-006-9026-z.
[166]
Martin Schieg Risk management in construction project management. Journal of Business Economics and Management. 7, 2, 77–83.
[167]
Mawby, D. and Stupples, D. Systems thinking for managing projects. IEMC-2002: 2002 IEEE International Engineering Management Conference : Managing technology for the new economy : St. John’s College, Cambridge, UK, 18-20 August, 2002 : proceedings. 344–349. DOI:https://doi.org/10.1109/IEMC.2002.1038455.
[168]
Maylor, H. et al. 2008. Managerial Complexity in Project-Based Operations: A Grounded Model and Its Implications for Practice. Project Management Journal. 39, 1_suppl (Jan. 2008), S15–S26. DOI:https://doi.org/10.1002/pmj.20057.
[169]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[170]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[171]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[172]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[173]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[174]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[175]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[176]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[177]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[178]
Maylor, H. 2010. Project management. Financial Times Prentice Hall.
[179]
Melese, Y. et al. 2017. Cooperation under uncertainty: Assessing the value of risk sharing and determining the optimal risk-sharing rule for agents with pre-existing business and diverging risk attitudes. International Journal of Project Management. 35, 3 (Apr. 2017), 530–540. DOI:https://doi.org/10.1016/j.ijproman.2016.11.007.
[180]
Miller, R. and Lessard, D. 2001. Understanding and managing risks in large engineering projects. International Journal of Project Management. 19, 8 (Nov. 2001), 437–443. DOI:https://doi.org/10.1016/S0263-7863(01)00045-X.
[181]
Milošević, D. et al. Case studies in project, program, and organizational project management. Wiley.
[182]
Milošević, D. and Martinelli, R.J. 2015. Project management toolbox. John Wiley & Sons, Inc.
[183]
Milošević, D. and Martinelli, R.J. 2015. Project management toolbox. John Wiley & Sons, Inc.
[184]
Mirko Sokovic 2009. Basic Quality Tools in Continuous Improvement Process. Strojniski Vestnik. 55, 5 (2009).
[185]
MIRZAEI, MARYAM1 Mmirzaei@unitec.ac.nzMABIN, VICTORIA2 2017. Agile Project Management and Public Policy Development Projects: A case study from New Zealand. Agile Project Management and Public Policy Development Projects: A case study from New Zealand. 15, Issue 1 (2017), 59–75.
[186]
Miterev, M. et al. 2017. Towards a design for the project-based organization. International Journal of Project Management. 35, 3 (Apr. 2017), 479–491. DOI:https://doi.org/10.1016/j.ijproman.2016.12.007.
[187]
Moodley, K. et al. 2008. Stakeholder matrix for ethical relationships in the construction industry. Construction Management and Economics. 26, 6 (Jun. 2008), 625–632. DOI:https://doi.org/10.1080/01446190801965368.
[188]
Morris, P. 2013. Reconstructing Project Management Reprised: A Knowledge Perspective. Project Management Journal. 44, 5 (Oct. 2013), 6–23. DOI:https://doi.org/10.1002/pmj.21369.
[189]
Morris, P. 2013. Reconstructing Project Management Reprised: A Knowledge Perspective. Project Management Journal. 44, 5 (Oct. 2013), 6–23. DOI:https://doi.org/10.1002/pmj.21369.
[190]
Morris, P.W.G. 2013. Reconstructing project management. John Wiley & Sons.
[191]
Morris, P.W.G. et al. 2011. The Oxford handbook of project management. Oxford University Press.
[192]
Munro, A. 2018. HS2 railway, UK – why the country needs it. Proceedings of the Institution of Civil Engineers - Transport. (Nov. 2018), 1–9. DOI:https://doi.org/10.1680/jtran.18.00040.
[193]
Net zero: HS2 review to examine environmental benefits - Energy Live News: https://www.energylivenews.com/2019/08/21/net-zero-hs2-review-to-examine-environmental-benefits/.
[194]
Newcombe, R. 2003. From client to project stakeholders: a stakeholder mapping approach. Construction Management and Economics. 21, 8 (Dec. 2003), 841–848. DOI:https://doi.org/10.1080/0144619032000072137.
[195]
Ng, A. and Loosemore, M. 2007. Risk allocation in the private provision of public infrastructure. International Journal of Project Management. 25, 1 (Jan. 2007), 66–76. DOI:https://doi.org/10.1016/j.ijproman.2006.06.005.
[196]
NHS IT system one of ‘worst fiascos ever’, say MPs - BBC News: https://www.bbc.co.uk/news/uk-politics-24130684.
[197]
Nicholas, J.M. and Steyn, H. Project management for business, engineering, and technology: principles and practice. Elsevier Butterworth Heinemann.
[198]
Nicolas Bouleau 22AD. To understand risk, use your imagination | New Scientist. (22AD).
[199]
Ning, Y. 2018. Impact of quality performance ambiguity on contractor’s opportunistic behaviors in person-to-organization projects: The mediating roles of contract design and application. International Journal of Project Management. 36, 4 (May 2018), 640–649. DOI:https://doi.org/10.1016/j.ijproman.2018.01.008.
[200]
Norman, E.S. et al. 2011. Work Breakdown Structures: the Foundation for Project Management Excellence. John Wiley & Sons.
[201]
North and Midlands most opposed to HS2, survey reveals | News | Building: https://www.building.co.uk/news/north-and-midlands-most-opposed-to-hs2-survey-reveals/5104118.article.
[202]
Olander, S. 2007. Stakeholder impact analysis in construction project management. Construction Management and Economics. 25, 3 (Mar. 2007), 277–287. DOI:https://doi.org/10.1080/01446190600879125.
[203]
Olander, S. and Landin, A. 2008. A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics. 26, 6 (Jun. 2008), 553–561. DOI:https://doi.org/10.1080/01446190701821810.
[204]
Osipova, E. and Eriksson, P.E. 2011. How procurement options influence risk management in construction projects. Construction Management and Economics. 29, 11 (Nov. 2011), 1149–1158. DOI:https://doi.org/10.1080/01446193.2011.639379.
[205]
Oswald, A. et al. 2018. Project Management at the Edge of Chaos. Springer Berlin Heidelberg.
[206]
Padalkar, M. and Gopinath, S. 2016. Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature. International Journal of Project Management. 34, 4 (May 2016), 688–700. DOI:https://doi.org/10.1016/j.ijproman.2016.02.009.
[207]
Patanakul, P. et al. 2016. What impacts the performance of large-scale government projects? International Journal of Project Management. 34, 3 (Apr. 2016), 452–466. DOI:https://doi.org/10.1016/j.ijproman.2015.12.001.
[208]
Payne, S. 26AD. The benefits of HS2 are becoming harder to discern. Financial Times. (26AD).
[209]
Perrin, R. Real world project management: beyond conventional wisdom, best practices, and project methodologies. John Wiley & Sons.
[210]
Peter W. G. Morris 2013. Reconstructing Project Management. John Wiley & Sons, Incorporated.
[211]
Phua, F.T.T. 2004. The antecedents of co‐operative behaviour among project team members: an alternative perspective on an old issue. Construction Management and Economics. 22, 10 (Dec. 2004), 1033–1045. DOI:https://doi.org/10.1080/01446190310001649092.
[212]
Pinto, J.K. and Winch, G. 2016. The unsettling of "settled science:” The past and future of the management of projects. International Journal of Project Management. 34, 2 (Feb. 2016), 237–245. DOI:https://doi.org/10.1016/j.ijproman.2015.07.011.
[213]
Plimmer, G. 19AD. Why HS2 rail line is way over budget and badly delayed. Financial Times. (19AD).
[214]
Project Management Institute 2013. Agile Project Management: essentials from the Project Management Journal. J. Wiley & Sons.
[215]
Pros and Cons of High Speed Rail HS2 | Economics Help: https://www.economicshelp.org/blog/3088/economics/pros-and-cons-of-high-speed-rail-hs2/.
[216]
Qazi, A. et al. 2016. Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International Journal of Project Management. 34, 7 (Oct. 2016), 1183–1198. DOI:https://doi.org/10.1016/j.ijproman.2016.05.008.
[217]
Rad, P.F. and Levin, G. 2014. Achieving Project Management Success Using Virtual Teams. J. Ross Publishing, Incorporated.
[218]
Raftery, J. Risk analysis in project management. E & FN Spon.
[219]
Raisbeck, P. et al. 2010. Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics. 28, 4 (Apr. 2010), 345–359. DOI:https://doi.org/10.1080/01446190903582731.
[220]
Ralph, P. 2018. The two paradigms of software development research. Science of Computer Programming. 156, (May 2018), 68–89. DOI:https://doi.org/10.1016/j.scico.2018.01.002.
[221]
Raydugin, Y. 2013. Project risk management: essential methods for project teams and decision makers. Wiley.
[222]
Raz, T. and Michael, E. 2001. Use and benefits of tools for project risk management. International Journal of Project Management. 19, 1 (Jan. 2001), 9–17. DOI:https://doi.org/10.1016/S0263-7863(99)00036-8.
[223]
RIBA Plan of Work 2013: https://www.ribaplanofwork.com/.
[224]
Rodrigues, A.G. and Williams, T.M. 1998. System dynamics in project management: assessing the impacts of client behaviour on project performance. Journal of the Operational Research Society. 49, 1 (Jan. 1998), 2–15. DOI:https://doi.org/10.1057/palgrave.jors.2600490.
[225]
ROMERO, ALEJANDRO1 romero-torres.alejandro@uqam.caPARÉ, MAGALIE2KHEMICI, NASSIM2 2017. The HOT POTATO GAME roles and responsibilities for realizing IT project benefits. The HOT POTATO GAME roles and responsibilities for realizing IT project benefits. (2017), 72–79.
[226]
Rowena Mason 2020. Cancelling HS2 would fail new Tory voters, Boris Johnson told. Guardian. (Jan. 2020).
[227]
Rowlinson, S. and Cheung, Y.K.F. 2008. Stakeholder management through empowerment: modelling project success. Construction Management and Economics. 26, 6 (Jun. 2008), 611–623. DOI:https://doi.org/10.1080/01446190802071182.
[228]
Rozenes, S. et al. 2006. Project Control: Literature Review. Project Management Journal. 37, 4 (Sep. 2006), 5–14. DOI:https://doi.org/10.1177/875697280603700402.
[229]
Sanchez, Felipe1Bonjour, Eric2Micaëlli, Jean-Pierre3Monticolo, Davy4 2019. A Step for Improving THE TRANSITION BETWEEN TRADITIONAL PROJECT MANAGEMENT TO AGILE PROJECT MANAGEMENT Using a Project Management Maturity Model. A Step for Improving THE TRANSITION BETWEEN TRADITIONAL PROJECT MANAGEMENT TO AGILE PROJECT MANAGEMENT Using a Project Management Maturity Model. 7, Issue 1 (2019), 102–119. DOI:https://doi.org/10.19255/JMPM01906.
[230]
Shakar Reddy, M. Raja1 rajashakarmalae@gmail.comJigeesh, Nasina2 jigeeshn@gmail.comKumar, Prabhu3 prabsjntu@yahoo.co.in 2017. The Integration of Project Management with Supply Chain Management in Indian Pharmaceutical Projects. The Integration of Project Management with Supply Chain Management in Indian Pharmaceutical Projects. 14, Issue 4 (2017), 61–70.
[231]
Shenhar, A.J. et al. 2001. Project Success: A Multidimensional Strategic Concept. Long Range Planning. 34, 6 (Dec. 2001), 699–725. DOI:https://doi.org/10.1016/S0024-6301(01)00097-8.
[232]
Shi, C. et al. 2018. Asset Specificity and Contractors’ Opportunistic Behavior: Moderating Roles of Contract and Trust. Journal of Management in Engineering. 34, 5 (Sep. 2018). DOI:https://doi.org/10.1061/(ASCE)ME.1943-5479.0000632.
[233]
Shore, B. 2008. Systematic biases and culture in project failures. Project Management Journal. 39, 4 (Nov. 2008), 5–16. DOI:https://doi.org/10.1002/pmj.20082.
[234]
Silvius, G. et al. 2012. Sustainability in Project Management. Ashgate Pub.
[235]
Simard, M. et al. 2018. The utopia of order versus chaos: A conceptual framework for governance, organizational design and governmentality in projects. International Journal of Project Management. 36, 3 (Apr. 2018), 460–473. DOI:https://doi.org/10.1016/j.ijproman.2018.01.003.
[236]
Simard, M. et al. 2018. The utopia of order versus chaos: A conceptual framework for governance, organizational design and governmentality in projects. International Journal of Project Management. 36, 3 (Apr. 2018), 460–473. DOI:https://doi.org/10.1016/j.ijproman.2018.01.003.
[237]
Simon Jenkins 2019. Boris Johnson should have the guts to kill HS2 | Simon Jenkins. Guardian. (Aug. 2019).
[238]
Stewart, R.W. and Fortune, J. 1995. Application of systems thinking to the identification, avoidance and prevention of risk. International Journal of Project Management. 13, 5 (Oct. 1995), 279–286. DOI:https://doi.org/10.1016/0263-7863(95)00024-K.
[239]
Stingl, V. and Geraldi, J. 2017. Errors, lies and misunderstandings: Systematic review on behavioural decision making in projects. International Journal of Project Management. 35, 2 (Feb. 2017), 121–135. DOI:https://doi.org/10.1016/j.ijproman.2016.10.009.
[240]
STOP HS2 - The national campaign against High Speed Rail 2: http://stophs2.org/.
[241]
Sutterfield, J. Scott1Friday-Stroud, Shawnta S.1Shivers-Blackwell, Sheryl L.1 2007. How NOT to Manage a Project: Conflict Management Lessons Learned from a DOD Case Study. Journal of Behavioral & Applied Management. 8, Issue 3 (2007), 218–238.
[242]
Sutterfield, J.S. et al. 2006. A Case Study of Project and Stakeholder Management Failures: Lessons Learned. Project Management Journal. 37, 5 (Dec. 2006), 26–35. DOI:https://doi.org/10.1177/875697280603700504.
[243]
Swan, J. et al. 2010. Why don’t (or do) organizations learn from projects? Management Learning. 41, 3 (Jul. 2010), 325–344. DOI:https://doi.org/10.1177/1350507609357003.
[244]
Sweet, R. 2019. HS2’s moment of truth. Construction Research and Innovation. 10, 3 (Jul. 2019), 54–59. DOI:https://doi.org/10.1080/20450249.2019.1654235.
[245]
Sydow, J. et al. 2004. Project-Based Organizations, Embeddedness and Repositories of Knowledge: Editorial. Organization Studies. 25, 9 (Nov. 2004), 1475–1489. DOI:https://doi.org/10.1177/0170840604048162.
[246]
Taggart, M. et al. 2014. The role of the supply chain in the elimination and reduction of construction rework and defects: an action research approach. Construction Management and Economics. 32, 7–8 (Aug. 2014), 829–842. DOI:https://doi.org/10.1080/01446193.2014.904965.
[247]
Taggart, M. et al. 2014. The role of the supply chain in the elimination and reduction of construction rework and defects: an action research approach. Construction Management and Economics. 32, 7–8 (Aug. 2014), 829–842. DOI:https://doi.org/10.1080/01446193.2014.904965.
[248]
Tang, Y. et al. 2020. Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter? International Journal of Project Management. 38, 3 (Apr. 2020), 188–199. DOI:https://doi.org/10.1016/j.ijproman.2020.03.002.
[249]
Taroun, A. 2014. Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management. 32, 1 (Jan. 2014), 101–115. DOI:https://doi.org/10.1016/j.ijproman.2013.03.004.
[250]
The Case Against HS2 - High Speed 2 Action Alliance: http://www.hs2actionalliance.org/case-against-hs2/.
[251]
The imperial units error that downed a multi-million-dollar Mars probe | New Scientist: https://institutions.newscientist.com/article/mg24332500-200-the-imperial-units-error-that-downed-a-multi-million-dollar-mars-probe/.
[252]
The National Programme for IT in the NHS: an update on the delivery of detailed care records systems - Public Accounts Committee: https://publications.parliament.uk/pa/cm201012/cmselect/cmpubacc/1070/107002.htm.
[253]
Thomas, J. 2006. Problematising Project Management. Making projects critical. Palgrave Macmillan. 90–107.
[254]
Thomé, A.M.T. et al. 2016. Similarities and contrasts of complexity, uncertainty, risks, and resilience in supply chains and temporary multi-organization projects. International Journal of Project Management. 34, 7 (Oct. 2016), 1328–1346. DOI:https://doi.org/10.1016/j.ijproman.2015.10.012.
[255]
Turner, J.R. 2007. Contracting for Project Management. Ashgate Pub.
[256]
Turner, J.R. and Cochrane, R.A. 1993. Goals-and-methods matrix: coping with projects with ill defined goals and/or methods of achieving them. International Journal of Project Management. 11, 2 (May 1993), 93–102. DOI:https://doi.org/10.1016/0263-7863(93)90017-H.
[257]
Tuttle, S. 2012. Illustrating PRINCE2: project management in real terms. IT Governance Pub.
[258]
UDDIN, SHAHADAT1 shahadat.uddin@sydney.edu.au 2017. SOCIAL NETWORK ANALYSIS in Project Management. SOCIAL NETWORK ANALYSIS in Project Management. (2017), 106–113. DOI:https://doi.org/10.19255/JMPM01310.
[259]
University Of Roskilde 2015. Project management theory meets practice. Samfundslitteratur.
[260]
Unlocking the benefits of HS2 | Rail Engineer: https://www.railengineer.co.uk/2019/04/04/unlocking-the-benefits-of-hs2/.
[261]
Use HS2 billions to help West Midlands and Staffordshire commuters - expert | Express & Star: https://www.expressandstar.com/news/transport/2020/01/27/use-hs2-billions-to-help-west-midlands-and-staffordshire-commuters-expert/.
[262]
Van Os, A. et al. 2015. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project. International Journal of Project Management. 33, 4 (May 2015), 877–888. DOI:https://doi.org/10.1016/j.ijproman.2014.10.016.
[263]
Van Os, A. et al. 2015. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project. International Journal of Project Management. 33, 4 (May 2015), 877–888. DOI:https://doi.org/10.1016/j.ijproman.2014.10.016.
[264]
Verzuh, E. 2016. The Fast Forward MBA in Project Management. Wiley.
[265]
Wall, J.A. and Callister, R.R. 1995. Conflict and Its Management. Journal of Management. 21, 3 (Jun. 1995), 515–558. DOI:https://doi.org/10.1177/014920639502100306.
[266]
Wang, N. et al. 2014. Whole Life Project Management Approach to Sustainability. Journal of Management in Engineering. 30, 2 (Mar. 2014), 246–255. DOI:https://doi.org/10.1061/(ASCE)ME.1943-5479.0000185.
[267]
Wang, S.Q. et al. 2004. Risk management framework for construction projects in developing countries. Construction Management and Economics. 22, 3 (Mar. 2004), 237–252. DOI:https://doi.org/10.1080/0144619032000124689.
[268]
Wang, W. et al. 2018. Contractual Complexity in Construction Projects. Project Management Journal. 49, 3 (Jun. 2018), 46–61. DOI:https://doi.org/10.1177/8756972818770589.
[269]
Wang, Y. et al. 2018. Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. International Journal of Project Management. 36, 6 (Aug. 2018), 899–909. DOI:https://doi.org/10.1016/j.ijproman.2018.01.007.
[270]
Wang, Y. et al. 2018. Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. International Journal of Project Management. 36, 6 (Aug. 2018), 899–909. DOI:https://doi.org/10.1016/j.ijproman.2018.01.007.
[271]
Wang, Y. 2015. Evolution of public–private partnership models in American toll road development: Learning based on public institutions’ risk management. International Journal of Project Management. 33, 3 (Apr. 2015), 684–696. DOI:https://doi.org/10.1016/j.ijproman.2014.10.006.
[272]
Ward, S. and Chapman, C. 2003. Transforming project risk management into project uncertainty management. International Journal of Project Management. 21, 2 (Feb. 2003), 97–105. DOI:https://doi.org/10.1016/S0263-7863(01)00080-1.
[273]
Weick, K.E. Making sense of the organization: Vol. 2: The impermanent organization. Wiley.
[274]
What benefits will the HS2 Railway Network bring? – RG Group: https://rg-group.co.uk/what-benefits-will-the-hs2-railway-network-bring/.
[275]
Whistleblowers say public have been ‘deceived’ over cost of HS2: Wessex FM - News: https://www.wessexfm.com/news/national/3032238/whistleblowers-say-public-have-been-deceived-over-cost-of-hs2/.
[276]
Wied, M. et al. 2020. Managing exploratory projects: A repertoire of approaches and their shared underpinnings. International Journal of Project Management. 38, 2 (Feb. 2020), 75–84. DOI:https://doi.org/10.1016/j.ijproman.2019.12.002.
[277]
Williams, T. et al. 1995. The Effects of Design Changes and Delays on Project Costs. Journal of the Operational Research Society. 46, 7 (Jul. 1995), 809–818.
[278]
Willumsen, P. et al. 2019. Value creation through project risk management. International Journal of Project Management. 37, 5 (Jul. 2019), 731–749. DOI:https://doi.org/10.1016/j.ijproman.2019.01.007.
[279]
Winch, G.M. 2014. Three domains of project organising. International Journal of Project Management. 32, 5 (Jul. 2014), 721–731. DOI:https://doi.org/10.1016/j.ijproman.2013.10.012.
[280]
Winch, G.M. 2014. Three domains of project organising. International Journal of Project Management. 32, 5 (Jul. 2014), 721–731. DOI:https://doi.org/10.1016/j.ijproman.2013.10.012.
[281]
Winter, M. et al. 2006. Directions for future research in project management: The main findings of a UK government-funded research network. International Journal of Project Management. 24, 8 (Nov. 2006), 638–649. DOI:https://doi.org/10.1016/j.ijproman.2006.08.009.
[282]
Wysocki, R.K. 2019. Effective project management: traditional, agile, extreme, hybrid. Wiley.
[283]
Xia, N. et al. 2018. Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas. International Journal of Project Management. 36, 5 (Jul. 2018), 701–715. DOI:https://doi.org/10.1016/j.ijproman.2018.03.006.
[284]
Xia, N. et al. 2018. Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas. International Journal of Project Management. 36, 5 (Jul. 2018), 701–715. DOI:https://doi.org/10.1016/j.ijproman.2018.03.006.
[285]
Xiang, P. et al. 2012. Construction Project Risk Management Based on the View of Asymmetric Information. Journal of Construction Engineering and Management. 138, 11 (Nov. 2012), 1303–1311. DOI:https://doi.org/10.1061/(ASCE)CO.1943-7862.0000548.
[286]
You, J. et al. 2018. Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. International Journal of Project Management. 36, 5 (Jul. 2018), 795–807. DOI:https://doi.org/10.1016/j.ijproman.2018.03.002.
[287]
Zaghloul, R. and Hartman, F. 2003. Construction contracts: the cost of mistrust. International Journal of Project Management. 21, 6 (Aug. 2003), 419–424. DOI:https://doi.org/10.1016/S0263-7863(02)00082-0.
[288]
Zhang, H. 2007. A redefinition of the project risk process: Using vulnerability to open up the event-consequence link. International Journal of Project Management. 25, 7 (Oct. 2007), 694–701. DOI:https://doi.org/10.1016/j.ijproman.2007.02.004.
[289]
Zhang, S. et al. 2016. Contractual Governance: Effects of Risk Allocation on Contractors’ Cooperative Behavior in Construction Projects. Journal of Construction Engineering and Management. 142, 6 (Jun. 2016). DOI:https://doi.org/10.1061/(ASCE)CO.1943-7862.0001111.
[290]
Zuo, F. and Zhang, K. 2018. Selection of risk response actions with consideration of secondary risks. International Journal of Project Management. 36, 2 (Feb. 2018), 241–254. DOI:https://doi.org/10.1016/j.ijproman.2017.11.002.
[291]
Zuo, F. and Zhang, K. 2018. Selection of risk response actions with consideration of secondary risks. International Journal of Project Management. 36, 2 (Feb. 2018), 241–254. DOI:https://doi.org/10.1016/j.ijproman.2017.11.002.
[292]
Zwikael, O. et al. 2018. Project benefit management: Setting effective target benefits. International Journal of Project Management. 36, 4 (May 2018), 650–658. DOI:https://doi.org/10.1016/j.ijproman.2018.01.002.
[293]
17AD. Birmingham MPs call for Boris Johnson to deliver the ‘promised benefits of HS2’ for Brummies - Birmingham Live. (17AD).
[294]
20181208. Britain’s engineering reputation goes down the tube. The Economist. (20181208).
[295]
20181208. Britain’s engineering reputation goes down the tube. The Economist. (20181208).
[296]
20190815. Britain’s government tries to trim the £56bn cost of HS2. The Economist. (20190815).
[297]
21AD. Government announces independent review into HS2 programme - GOV.UK. (21AD).
[298]
16AD. House of Lords - Rethinking High Speed 2 - Economic Affairs Committee. House of Lords.
[299]
House of Lords - The Economics of High Speed 2 - Economic Affairs Committee. House of Lords.
[300]
24AD. HS2: 12 arguments for and against - BBC News. (24AD).
[301]
3AD. HS2 benefits ‘substantially undervalued’ amid rising costs | News | Railway Gazette. (3AD).
[302]
2019. HS2 costs and benefits: a search for clear evidence | Letters. Guardian. (Aug. 2019).
[303]
21AD. HS2 make or break decision looms | Railnews | Today’s news for Tomorrow’s railway. (21AD).
[304]
21AD. HS2: Review to examine costs and benefits of rail project - BBC News. (21AD).
[305]
HS2 will serve wealthier passengers and deliver more benefits to London than the North | New Economics Foundation.
[306]
Oakervee review calls for HS2 Ltd to be stripped of Euston project. Financial Times.
[307]
9AD. Overdue and over Budget, over and over Again. (9AD).
[309]
The future is bright, the future is… you! Project.
[310]
2AD. The imperial units error that downed a multi-million-dollar Mars probe | New Scientist. (2AD).
[311]
2011. The NAO Guide to Initiating Successful Projects. National Audit Office.
[312]
20181201. Why archaeologists love HS2. The Economist. (20181201).
[313]
31AD. You really can fool some of the people, all of the time. The Economist. (31AD).